PARKING Projects:
Wachovia Bank
Location: Winston-Salem, North Carolina
Completed: June 1998
Budget: $20,500,000 (entire project), $10,000,000 (parking deck)
Square Footage: 218,000 SF
(7-Story), 190,000 SF (attached 5-story parking)
Architect: Kendall Heaton Associates

The Winston-Salem project, was Russell's second project as Construction Manager for Wachovia Bank. The 7-story, 218,000 s.f. is structural steel with poured-in-place concrete slabs topped over metal decking; the envelope is a glazed aluminum curtain wall. Additionally, The facility boasts an attached 5-story, 190,000 s.f. precast concrete parking deck.